Queensland is asking more of its construction industry than ever before, with a record pipeline of work and the 2032 Games landing in the same few years. The workforce needed to deliver it is projected to be 50,000 workers short. The usual fixes of more apprentices and more migration will help, but they take years to arrive. So the question worth asking is a simple one. Can a new way of employing casual workers actually make a difference?
A Pipeline Bigger Than the Workforce Behind It
The scale of work ahead of Queensland is hard to overstate. The Queensland Major Contractors Association puts the state’s five-year pipeline of major projects at $127.5 billion, a figure that covers major engineering and Games projects before a single new home is counted.¹
What matters more is how far the industry has to stretch to deliver it. QMCA estimates the industry will need to lift its annual output by at least 60% to deliver funded works alone and by more than 150% to deliver the full pipeline at its peak.¹ That isn’t growth at the margins.
In a typical cycle, a slowdown in one sector frees up workers for a boom in another. This time, civil works, energy, commercial building and housing all draw on the same workforce at once, leaving no quiet corner of the industry to pull workers from. That’s exactly where the pressure begins.
The Gap Behind the Headlines
The workforce hasn’t kept pace with that pipeline and the gap is no longer a future problem. Construction Skills Queensland forecasts a peak shortfall of around 50,000 construction workers in Queensland in 2026-27.² In other words, the projected peak isn’t years away. It falls in the current financial year.
The cost of that gap doesn’t stay on site. The Housing Industry Association warns workforce shortages are slowing project delivery, pushing up construction costs and limiting the industry’s ability to meet housing demand.³ It’s a pattern builders already recognise in tighter programs and longer waits for labour.
Shortages also compound. When one job runs short, its finish date slips and the next start moves with it. Across a busy year the delay reaches the end of the line, where a family waits on the keys to a home that should already be finished.
So, Can Casu Actually Make a Difference?
The short answer is yes, though not in the way a shortfall figure might suggest. No single platform, training program or migration intake will close a gap of 50,000 workers. What can change is how many people are able to work in construction and how easily businesses can reach them.
Casu was built for people who want site work on flexible terms, such as students, career changers and semi-retirees, who previously had no practical way in. More than 10,000 workers and 1,000 businesses have registered, with each worker employed directly as a casual by the business that books them rather than as a contractor.
But the shortage was never just about headcount. It’s also the byproduct of productivity that has fallen around 9% since 2018,⁴ trades doing labouring work, slow hiring and workers who don’t stay. Adding workers is only half the answer. Making the existing workforce go further is the other half and Casu does both.
What That Difference Looks Like for Your Business
If you’re running a construction business, you know the shortage doesn’t arrive as a statewide number. It arrives as a job a few people short, a delivery nobody is free to take and a program that starts to slip. That’s where an industry-level contribution becomes something you feel on your own site.
That’s a labourer booked through Casu the afternoon before for as little as four hours. They’re on site at 6am to take the delivery and stage materials before your trades arrive, a worker who is yours without the admin attached. Rebook the ones who perform and you build a bench who know your sites.
Measured against a statewide forecast, a few extra workers can look modest. But for a crew two people short on a Monday morning, they decide whether the job moves or stalls. On that scale, they aren’t modest at all. They’re the difference.